Category: Completed Research Forum: Uncovering Genome Mysteries Thread: Progress of the project |
No member browsing this thread |
Thread Status: Active Total posts in this thread: 123
|
Author |
|
KLiK
Master Cruncher Croatia Joined: Nov 13, 2006 Post Count: 3108 Status: Offline Project Badges: |
WoW, back to Aug...seems like we're all going forward!
---------------------------------------- |
||
|
Falconet
Master Cruncher Portugal Joined: Mar 9, 2009 Post Count: 3295 Status: Offline Project Badges: |
84% on project page.
----------------------------------------Lates batch number I got is 25098/28679 = 87.5% completed AMD Ryzen 5 1600AF 6C/12T 3.2 GHz - 85W AMD Ryzen 5 2500U 4C/8T 2.0 GHz - 28W AMD Ryzen 7 7730U 8C/16T 3.0 GHz |
||
|
KLiK
Master Cruncher Croatia Joined: Nov 13, 2006 Post Count: 3108 Status: Offline Project Badges: |
it's been a great pleasure serving scientists in UGM project...have fun all! ;)
----------------------------------------I've aborted all extra Win units from my personal computers...so you can have more guys...now, to next goal! Been a pleasure of giving back 10y for a special D badge & 15M points on UGM... ;) |
||
|
SekeRob
Master Cruncher Joined: Jan 7, 2013 Post Count: 2741 Status: Offline |
Missing a 'We have reduced the feeder priority for UGM' post by technicians. The returns for this science have plummeted... by extrapolation 1.5 million tasks completing in June, where 2 months ago it was 3.2 million. See https://bit.ly/WCGRSPM ... no rush to get those Zika additions computed that were bolted on the last series of batches?
(Other sciences have not fallen anywhere near with the introduction of OpenZika, and HST is peanuts on the scale of other projects.)) |
||
|
Speedy51
Veteran Cruncher New Zealand Joined: Nov 4, 2005 Post Count: 1265 Status: Offline Project Badges: |
85% on project page.
----------------------------------------Unless more work have been added that we are not aware of percentage complete is 8.35% behind actual project position Latest batch number I got is 26774/28679x100 =93.35% completed [Edit 2 times, last edit by Speedy51 at Jul 22, 2016 9:25:41 AM] |
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
Latest batch # I have received is 27252. With batch 27245, 95% of the known batches have been distributed.
|
||
|
SekeRob
Master Cruncher Joined: Jan 7, 2013 Post Count: 2741 Status: Offline |
Somewhere between 30-40 days from now we might get a 30 day EOKW notice. My impression is the weights/priorities got a little reshuffle in the past 48 hours, at least my 5 project profile associated 8 core is seeing a different [to me improved] mix.
|
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
I think you're right. When I rejoined the UGM project middle of last week it was averaging about 20 batches per day. Then the ZIKA hiccup happened around Friday and it went up to around 40 batches per day for one day. Since the ZIKA workflow was corrected it dropped to 13 or less. There were about 3 days last week when it was a consistent 20 per day but since about Saturday it has dropped to the old 13 per day.
----------------------------------------Using 13 per day as the average leaves about 109.5 days of work (middle of November) if everything remains the same. [Edit 1 times, last edit by Doneske at Aug 15, 2016 8:45:50 PM] |
||
|
NixChix
Veteran Cruncher United States Joined: Apr 29, 2007 Post Count: 1187 Status: Offline Project Badges: |
Doneske:
----------------------------------------I think you're right. When I rejoined the UGM project middle of last week it was averaging about 20 batches per day. Then the ZIKA hiccup happened around Friday and it went up to around 40 batches per day for one day. Since the ZIKA workflow was corrected it dropped to 13 or less. There were about 3 days last week when it was a consistent 20 per day but since about Saturday it has dropped to the old 13 per day. Using 13 per day as the average leaves about 109.5 days of work (middle of November) if everything remains the same. I hope the work holds out to the middle of November. I am trying to get to 10 years on both MCM and UGM before the work runs out. I am between 9 & 10 years on MCM and will switch to 100% UGM as soon as I think I have enough in the pipeline to hit 10. I got worried when I saw the official completion advance to October. I just built a new 6 core/12 thread cruncher and I thought I had a chance to grab a second 10 year diamond award. Cheers |
||
|
KLiK
Master Cruncher Croatia Joined: Nov 13, 2006 Post Count: 3108 Status: Offline Project Badges: |
Doneske: I think you're right. When I rejoined the UGM project middle of last week it was averaging about 20 batches per day. Then the ZIKA hiccup happened around Friday and it went up to around 40 batches per day for one day. Since the ZIKA workflow was corrected it dropped to 13 or less. There were about 3 days last week when it was a consistent 20 per day but since about Saturday it has dropped to the old 13 per day. Using 13 per day as the average leaves about 109.5 days of work (middle of November) if everything remains the same. I hope the work holds out to the middle of November. I am trying to get to 10 years on both MCM and UGM before the work runs out. I am between 9 & 10 years on MCM and will switch to 100% UGM as soon as I think I have enough in the pipeline to hit 10. I got worried when I saw the official completion advance to October. I just built a new 6 core/12 thread cruncher and I thought I had a chance to grab a second 10 year diamond award. Cheers Research page gives an end of UGM in Oct, while MCM was postponed to Nov! You might have to rethink your strategy with those new info... |
||
|
|