Hmmm, get only the other platforms message - which OS is still not fully utilised? ;-)
|
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
Also in Win XP getting lots of 'other platforms'...
|
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
GOT 8 at 14 % still got 30 hours to go.
----------------------------------------6 a's and 2 b's [Edit 1 times, last edit by Former Member at Jul 15, 2011 8:37:41 PM] |
||
|
mfbabb2
Senior Cruncher USA Joined: Feb 18, 2011 Post Count: 361 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Got 4 DDDT Betas with estimated times: 2 ~ 5:50 hrs 1 ~ 13:30 1 ~ 72:50 (Of course it could be my computers.) And for some reason these are: Quorum 2 Replication 3 The 72 hr WU is down to 60 hr remaining (7.8%), but the 13 hr is up to 14 hr (5.1%) after 1:25 hrs running.
Murphy
![]() |
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
hmmm, is this A, B or C type? Smells like a limited run of A or B. --//-- The few I got were As. Estimated run times are from 5.5 to 52 hours. ![]() OK, thanks and explains why my Linux quad did not get them... the reliability was blown yesterday, when 22 tasks suffered a signal 11. Reminds me of the msg that knreed considered to develop that could be made to appear in a client log when Reliability was reached. The log now only tells there is no work, or only for other platforms, not that reliability is insufficient. Presently one only knows if repair jobs arrive. --//-- |
||
|
Crystal Pellet
Veteran Cruncher Joined: May 21, 2008 Post Count: 1330 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
I got 8 b-types (pe) estimated runtimes from 9 hours up to 30 hours on the slowest system.
And 7 a-types (ps) estimated runtimes from 9 hours up to 18 hours. |
||
|
nanoprobe
Master Cruncher Classified Joined: Aug 29, 2008 Post Count: 2998 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Lost my router today. No more for me.
----------------------------------------![]() ![]() Luckily I had just switched my cache back to 1 day before it died so I'll have enough work to keep the crunchers busy until I can get a replacement tomorrow. ![]()
In 1969 I took an oath to defend and protect the U S Constitution against all enemies, both foreign and Domestic. There was no expiration date.
![]() ![]() |
||
|
KWSN - A Shrubbery
Master Cruncher Joined: Jan 8, 2006 Post Count: 1585 Status: Offline |
hmmm, is this A, B or C type? Smells like a limited run of A or B. --//-- The few I got were As. Estimated run times are from 5.5 to 52 hours. ![]() OK, thanks and explains why my Linux quad did not get them... the reliability was blown yesterday, when 22 tasks suffered a signal 11. --//-- You are an incredible wealth of information. Here I was trying to figure out why some systems got them and others didn't and I had completely forgotten the reliability rule on A types. I have 10ish units ranging from 8 hours for an SE to 46 hours for a PS. On the bright side, this will push me into ruby territory. I was going to miss it by less than 2 days without these units. I know the HFCC beta was coming, but no one likes to have to wait. As for platforms, I got them on a W7-64, XP, and Ubuntu 64 ![]() Distributed computing volunteer since September 27, 2000 |
||
|
Crystal Pellet
Veteran Cruncher Joined: May 21, 2008 Post Count: 1330 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
I got 1 'Home Alone' Beta dddt type c with strange shorter deadline:
Project Name: Beta - Discovering Dengue Drugs - Together - Phase 2 |
||
|
KWSN - A Shrubbery
Master Cruncher Joined: Jan 8, 2006 Post Count: 1585 Status: Offline |
One of my tasks is up to 22 hours and still hasn't reached 30%. This could be a whopper. The others are all scheduled to finish in less than 24 hours.