Index | Recent Threads | Unanswered Threads | Who's Active | Guidelines | Search |
![]() |
World Community Grid Forums
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
No member browsing this thread |
Thread Status: Active Total posts in this thread: 24
|
![]() |
Author |
|
seippel
Former World Community Grid Tech Joined: Apr 16, 2009 Post Count: 392 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
We have now reached the point where we have about 23 days of work units remaining for target-10. Once these remaining work units are sent out, no new work units will be available for this project until Target-11 is ready. Target-11 is estimated to be ready in April.
Seippel |
||
|
gb009761
Master Cruncher Scotland Joined: Apr 6, 2005 Post Count: 2986 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Yet another target
----------------------------------------![]() This project is certainly turning out to be exceeding ALL expectations - well done everyone. ![]() |
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
Not suspecting non-sequential batch distribution, just had a 2845xxx, meaning the last 10000 compounds of T10 are moving to the feeder. That would mean that latest starting tomorrow night the supply will be solely coming from No Reply and Repairs [thin]. Hindcast, Jan17-Feb8 the 23 day estimate was very accurate [but then, if you control the daily numbers being fed ;>]
Crunch On P.S. Bulked up BTW as this is my current project to go for 3 years contribution mark, just having completed the C4CW 3 year target. Wont be making it now, for HFCC, but then T11 is still to come to make up for any deficit. |
||
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
Just gave 15 jobs back that would not possibly complete in time [buffered work most all ran 12-15 hours per task, but the <dont_use_dcf/> instruction prevented TTC to be adjusted in the client task view, they were sitting there with 9:25 hours as if they were going to complete in time. Probably have to give more back...depends if the remainder do same or do 7-8 hours as some in between are doing... just want that 3 years complete [but not likely to make it in this Target 10 round]
|
||
|
Mike.Gibson
Ace Cruncher England Joined: Aug 23, 2007 Post Count: 12435 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
If there is 23 days work left, why is it saying that there is only GPU work available?
|
||
|
deltavee
Ace Cruncher Texas Hill Country Joined: Nov 17, 2004 Post Count: 4891 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
If there is 23 days work left, why is it saying that there is only GPU work available? There were 23 days of work left when the post was made on January 17th. |
||
|
asdavid
Veteran Cruncher FRANCE Joined: Nov 18, 2004 Post Count: 521 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Target-11 is estimated to be ready in April. Seippel Any news about when target 11 will be ready? Thanks
Anne-Sophie
![]() |
||
|
Viktors
Former World Community Grid Tech Joined: Sep 20, 2004 Post Count: 653 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
We are hoping for a new target later in April or May. However it depends on how soon the target's protein structure can be determined. This is being done by another research organization. Large proteins are difficult to crystallize and this time consuming step is required before they can use x-ray crystallography to determine the exact structure of the target.
|
||
|
CandymanWCG
Senior Cruncher Romania Joined: Dec 20, 2010 Post Count: 421 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Thanks for the update! Much appreciated!
----------------------------------------Knowledge is limited. Imagination encircles the world! - Albert Einstein ![]() ![]() |
||
|
Falconet
Master Cruncher Portugal Joined: Mar 9, 2009 Post Count: 3295 Status: Offline Project Badges: ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Thanks for the update!
----------------------------------------AMD Ryzen 5 1600AF 6C/12T 3.2 GHz - 85W AMD Ryzen 5 2500U 4C/8T 2.0 GHz - 28W AMD Ryzen 7 7730U 8C/16T 3.0 GHz |
||
|
|
![]() |