Index | Recent Threads | Unanswered Threads | Who's Active | Guidelines | Search |
World Community Grid Forums
Category: Support Forum: Website Support Thread: Option "If there is no work available... not Working For MCM |
No member browsing this thread |
Thread Status: Active Total posts in this thread: 12
|
Author |
|
BobbyB
Veteran Cruncher Canada Joined: Apr 25, 2020 Post Count: 598 Status: Offline Project Badges: |
I tried that option ("If there's not work") and it sent me ARP WU's some months ago. I'm not a fan of tying-up machines for the lengthy period of days that ARP requires so didn't continue. Ha. I had come to that same conclusion about lengthy ARPs. On the 2 where I don't want ARP I unselected ARP and "If there is no work available for the project(s)" in the default profile which they use. Other profiles have everything on but I use the limit option for ARP to 6 for my Ryzen 9 and 2 ARPs for the rest. No limit for other projects. This answers why, in my post above, I have more SCC1 than MCM1 for my Ryzen 9 (and in total). I have a limit of 20 for MCM1 and I don't remember why. I really don't care what runs so long as they run or walk for my lowly laptops. [Edit 1 times, last edit by BobbyB at May 27, 2023 3:28:16 PM] |
||
|
NixChix
Veteran Cruncher United States Joined: Apr 29, 2007 Post Count: 1187 Status: Offline Project Badges: |
I am saddened that WGC has not committed to correcting this issue or even acknowledged it,
----------------------------------------Cheers |
||
|
|