Index  | Recent Threads  | Unanswered Threads  | Who's Active  | Guidelines  | Search
 

Quick Go ยป
No member browsing this thread
Thread Status: Active
Thread Type: Sticky Thread
Total posts in this thread: 91
Posts: 91   Pages: 10   [ Previous Page | 1 2 3 4 5 6 7 8 9 10 | Next Page ]
[ Jump to Last Post ]
Post new Thread
Author
Previous Thread This topic has been viewed 159425 times and has 90 replies Next Thread
gb009761
Master Cruncher
Scotland
Joined: Apr 6, 2005
Post Count: 2977
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

Interesting. Not sure I understand how this could possibly happen. Seems to me a test bed should have been going for a long enough time now to ensure transition of work units could have been a couple of day effort. Not sure if I will continue back on WCG. This strikes me as the project having almost no priority with those that are in control, or they simply do not have the required resources to handle the project in the way it should be handled.

I totally agree - the project could (should) have been split up into phases, as the webiste/forum (and possibly other "smaler/sub-parts" of the system) could have been moved first, allowed to stabalise, before focusing on the major move, thereby reducing the scope of the move - and thus, the length of outage.
----------------------------------------

[Feb 15, 2022 12:50:43 PM]   Link   Report threatening or abusive post: please login first  Go to top 
poppinfresh99
Cruncher
Joined: Feb 29, 2020
Post Count: 49
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

Could (should) the project be split up for the move? Didn't someone official say earlier in this thread that they had a rushed timeline?

World Community Grid contributors could (should) have just loaded up on tasks or joined a backup project (maybe Rosetta with Resource Share set to 0). World Community Grid gave us plenty of warning.

Yes, this transition is a hassle for us contributors, but there is no sign that the SCIENCE is bad or suffering, which is what I really care about.
[Feb 15, 2022 2:03:12 PM]   Link   Report threatening or abusive post: please login first  Go to top 
spRocket
Senior Cruncher
Joined: Mar 25, 2020
Post Count: 254
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

I never got around to increasing queue lengths, so four of my five Raspberry Pis have now run out of work and the fifth is down to its last unit. I've set everything but my main cruncher to No New Tasks while I decide whether or not to move them to a new project. The main system is down to an ARP unit due in under an hour, an OPN1 in about half an hour, and one last ARP with 9.8 hours to go.

If SiDock recovers from the sudden crush of WCG refugees, I'll probably put the main one on it with a zero work share.
[Feb 15, 2022 3:09:34 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Robokapp
Senior Cruncher
Joined: Feb 6, 2012
Post Count: 248
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

what does a resource share of zero do? not pull any units unless everything else is dry?

Thank you
Robokapp
----------------------------------------
[Edit 1 times, last edit by Robokapp at Feb 15, 2022 3:37:43 PM]
[Feb 15, 2022 3:37:22 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Falconet
Master Cruncher
Portugal
Joined: Mar 9, 2009
Post Count: 3294
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

what does a resource share of zero do? not pull any units unless everything else is dry?

Thank you
Robokapp



Yes, it serves as a backup project.
----------------------------------------


AMD Ryzen 5 1600AF 6C/12T 3.2 GHz - 85W
AMD Ryzen 5 2500U 4C/8T 2.0 GHz - 28W
AMD Ryzen 7 7730U 8C/16T 3.0 GHz
[Feb 15, 2022 3:45:03 PM]   Link   Report threatening or abusive post: please login first  Go to top 
PMH_UK
Veteran Cruncher
UK
Joined: Apr 26, 2007
Post Count: 763
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

There are already some WUs being sent where validation was inconclusive (Pending Verification).
Expect a lot of re-sends in a few days from over-filled systems, I have some.

Paul.
----------------------------------------
Paul.
[Feb 15, 2022 4:26:33 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Sgt.Joe
Ace Cruncher
USA
Joined: Jul 4, 2006
Post Count: 7574
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

There are already some WUs being sent where validation was inconclusive (Pending Verification).
Expect a lot of re-sends in a few days from over-filled systems, I have some.
Paul.

Must not be too many of them. I am down to about 1000 units queued in multiple machines and I have only seen one re-send unit (_2). I half expected to see more. So far one machine has run out its queue and been shut down. I expect at least one more will run out in the next few hours.
Cheers
----------------------------------------
Sgt. Joe
*Minnesota Crunchers*
[Feb 15, 2022 6:39:29 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Unixchick
Veteran Cruncher
Joined: Apr 16, 2020
Post Count: 848
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

Just a guess, but I think there will be a normal amount of resends for a few days with a big wave of resends on the 18th and 19th
[Feb 15, 2022 7:02:24 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Mike.Gibson
Ace Cruncher
England
Joined: Aug 23, 2007
Post Count: 12128
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

Add the 20th.
[Feb 15, 2022 8:50:27 PM]   Link   Report threatening or abusive post: please login first  Go to top 
biini
Senior Cruncher
Finland
Joined: Jan 25, 2007
Post Count: 334
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: WCG Data Transfer Underway, Stress Test of New Infrastructure Scheduled For Feb 28th

Just a guess, but I think there will be a normal amount of resends for a few days with a big wave of resends on the 18th and 19th


I have 300+ WUs waiting for validation..
----------------------------------------

rtx, xeon, i9, ryzen, rnd laptops
dAM0NES 1991 ppl interested in beer, amigas or electornic music
[Feb 17, 2022 8:49:54 AM]   Link   Report threatening or abusive post: please login first  Go to top 
Posts: 91   Pages: 10   [ Previous Page | 1 2 3 4 5 6 7 8 9 10 | Next Page ]
[ Jump to Last Post ]
Post new Thread