Index  | Recent Threads  | Unanswered Threads  | Who's Active  | Guidelines  | Search
 

Quick Go »
No member browsing this thread
Thread Status: Active
Total posts in this thread: 4
[ Jump to Last Post ]
Post new Thread
Author
Previous Thread This topic has been viewed 1693 times and has 3 replies Next Thread
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Project quota

Where is the project quota setting? I want to change it but can't find it!
[Aug 3, 2017 3:54:34 PM]   Link   Report threatening or abusive post: please login first  Go to top 
SekeRob
Master Cruncher
Joined: Jan 7, 2013
Post Count: 2741
Status: Offline
Reply to this Post  Reply with Quote 
Re: Project quota

"Guessing" what you mean, where WCG is to BOINC 1 project, the buffer size has 2 controls, a minimum and an additional. Latter will only be backfilled when the minimum buffer 'quota', measured in computing time per active thread, has been reached.

The backfill has it's limits... there will only be new work requested until the buffer total goes below the minimum again. E.g. you can set 1 day minimum and 5 days additional, but WCG only gives a limited number of workunits per fetch request. If that call limit was hit, work fetching stops again, whether the computing time of those WU is 6 hours or 5 days worth.

Both the minimum and additional can be set at client level in computing preferences and on the website device profiles, where you have to hit the 'Custom' radio button to get all options beyond the presets.
[Aug 3, 2017 4:06:40 PM]   Link   Report threatening or abusive post: please login first  Go to top 
SekeRob
Master Cruncher
Joined: Jan 7, 2013
Post Count: 2741
Status: Offline
Reply to this Post  Reply with Quote 
Re: Project quota

More guessing, Resource Share or Project Weight (as it's called at WCG), found under the same Custom area of the device profiles is a relative value by which over a longer period of time the total computing time can be divided, if more than 1 project is attached to the BOINC client. Default value 100, meaning if you have 2 projects with default value attached each over a longer period will get approximate 50% of the volunteered computing time.
[Aug 3, 2017 4:20:29 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: Project quota

Project weight sounds like what I am trying to find. A number of things here are called different names or not done in the same way as normal BOINC projects. That said, I've seen a couple of newer BOINC projects have started calling things differently also. Used to be easy when all used basically a copy of Davids, (et al), originals.

<edit>
Yup, back to as it should be now. Thanks.
----------------------------------------
[Edit 2 times, last edit by Former Member at Aug 3, 2017 7:48:44 PM]
[Aug 3, 2017 7:28:21 PM]   Link   Report threatening or abusive post: please login first  Go to top 
[ Jump to Last Post ]
Post new Thread