I specified only Clean Energy Project during install But....

After the installation where I specifically turned off the FightAids and Leishmaniasis Projects I was surprised to see all 3 Projects Actively using my system resources on the Task page.

I only wanted to support the Clean Energy Project. How do I get these others to stop using my resources?
[Jun 24, 2013 8:15:18 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

Welcome to WCG.

One reason could be, you left the CEP2 setting at default 1 task 'in progress'. If your computer has more processor cores... a quad for instance, then the client tries to get work to also have these 'idle' processors get to crunch. Then the 'If there is no work for..." may be kicking in. Frankly, that's a guess. I cannot remember if such observations were reported before.

Supposing you have a quad, desktop, you could increase to 2 CEP2 [50% of total processors], and see if that works too. The science is heavily taxing, so any higher number is trial and error to find if things continue to function.

Whilst it would be a pity not using the other processors for other lighter work while you're at it, you could untick the "If there is not work for..." option, or reduce the % of processors in such a way that part of the CPU is used and no other sciences are pulled in.

Let us know what you want to opt for.
[Jun 24, 2013 8:54:51 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

Thanks for the reply.

I did find that check mark to let others run if what you've selected is not fully utilizing the system. I do have an 8 core i7 2600 clocked at 3.4GHz with 16 GB of ram so there's lots of usage going on as I've allowed 100% utilization. I've verified that all 8 cores are maxed at 100%.

My concern was one of too many units of work such that I'd hamper my needed work but so far no issues and I know I can always throttle back, if needed.
[Jun 25, 2013 1:32:00 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

That's great, and let us know if you need help setting more CEP2 and maximize that science contribution. An I7-2600 desktop could be easily 'tweaked', so that any number of that science always gets preferred runtime, and other sciences fill in the remaining cores. That can be done with the <max_concurrent> parm in a file to be created called app_config.xml and the v7.0.40+ client. Several topics in the CEP2 forum discuss this -new- feature. Got an I7-2670QM and had it run 8 CEP2, but then it became hands-off or the efficiency dropped and you started noticing BOINC was running during use. A good rule of thumb with power CPUs is about 50%, in your case 4 of 8.
[Jun 25, 2013 2:22:13 PM]   Link   Report threatening or abusive post: please login first  Go to top 
katoda
Senior Cruncher
Poland
Joined: Apr 28, 2007
Post Count: 172
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

@allenwissinger, have you checked section "My projects" on the left when opening "My grid" page? Maybe you have option "If there is no work available for the project(s) I have selected above, please send me work from another project." ticked?
And please check "Device manager/Device profiles" too, maybe in yor profile this option is ticked as well.
----------------------------------------

[Jun 25, 2013 3:28:38 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

He already said it was checked.......
I did find that check mark to let others run if what you've selected is not fully utilizing the system.
..... biggrin
[Jun 25, 2013 4:28:32 PM]   Link   Report threatening or abusive post: please login first  Go to top 
katoda
Senior Cruncher
Poland
Joined: Apr 28, 2007
Post Count: 172
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

I've read the whole thread again and now I have no idea what's wrong, the situation that other projects are running or not.
Anyway, looks like the issue is solved and another cruncher is a bit more happier :)
----------------------------------------

----------------------------------------
[Edit 2 times, last edit by katoda at Jun 25, 2013 5:14:45 PM]
[Jun 25, 2013 5:10:20 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

If you make changes in My Grid > My Projects, you change -All- device profiles you have, so heed thé! [with exclamation mark ;>],
[Jun 25, 2013 5:12:54 PM]   Link   Report threatening or abusive post: please login first  Go to top 
katoda
Senior Cruncher
Poland
Joined: Apr 28, 2007
Post Count: 172
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

Indeed, but my first though was that allenwissinger had the option unticked in "My projects" and then somehow managed to go to device profiles and then tick the option again. In such case, "My projects" would rather show that everything is OK, but profiles will say something different.
----------------------------------------

[Jun 25, 2013 5:18:14 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: I specified only Clean Energy Project during install But....

allenwissinger is fine, we're just just offering to help out if he wants to do CEP2 to the max, without impairment.