Things have been cleaning up from last weeks upgrade on 3/06 and all the WUs being put into inconclusive, pending validation et al. The pending validation backlog I had for about a week has been starting to get back to more normal levels now, and the huge list of inconclusive WUs have been slowly going away.
But I still have 2 WUs out there that have been out there for about 2 weeks in inconclusive mode and not clear out yet. How much longer should it take to clear those last hold outs to valid state? I don't think I've ever had WUs stay so long in validation pergatory as these two lonely WUs have been. Any ideas folks?..... |
||
|
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
If there is still another copy "In Progress" (Result Status Page > Work Unit detail link), then the wait is for you to endure in purgatory. Others let the servers just run their course as eventually the needed validation will be pushed or the task is suspended and unvalidated copies are pushed through for credit [without a wingman]. Then the task is set aside for inspection.
--//-- |
||
|
|
|