| Index | Recent Threads | Unanswered Threads | Who's Active | Guidelines | Search |
| World Community Grid Forums
|
| No member browsing this thread |
|
Thread Status: Active Total posts in this thread: 1
|
|
| Author |
|
|
Balu
Cruncher Joined: Nov 16, 2004 Post Count: 2 Status: Offline Project Badges:
|
I've seen the second time the WCG needs much more time to finish the unit after using Snooze and I aak myself if this is a general problem?
today I needed 10 h for finishing 50%..an then I used snooze for 5 Minutes and then he needed for 0,3 % over 2 hours ?? Now I restart the system and after some minutes he finished again 0,3%! Update: now after 20 Minutes the tool finished 0,9% So normal the system needs minutes and after snooze hours, may someone can check if he will get the same?? I normally don't need much CPU power, only less times during a day, but it would be bad to restart each time after using snooze. greets Balu |
||
|
|
|