Index  | Recent Threads  | Unanswered Threads  | Who's Active  | Guidelines  | Search
 

Quick Go »
No member browsing this thread
Thread Status: Active
Total posts in this thread: 20
Posts: 20   Pages: 2   [ 1 2 | Next Page ]
[ Jump to Last Post ]
Post new Thread
Author
Previous Thread This topic has been viewed 4951 times and has 19 replies Next Thread
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
The Clean Energy Project - Phase 2 project update, November 2, 2012

Hello everybody,

We want to take a moment out of our busy research lives and give you a bit of an overview on what has been going on so far in the Clean Energy Project Phase 2 on World Community Grid. We hope you enjoy this little walk down memory lane and the summary of our achievements in the first two years. There is still a lot more to be done, but here is where we stand today.

Thanks to all your generous help we have by now collected 10 million unique results in 12,500 years of computing time. The former corresponds to 120 million individual density functional theory calculations - which is a rather incredible number. It is most likely of the same order of magnitude as all quantum chemistry calculations that have been run in the history of quantum chemistry!

In the course of CEP2 we have developed a powerful and versatile molecule library generator, and with our friends at IBM we have ported Q-Chem to the BOINC platform, which is the first time a quantum chemistry program package has been adapted to a distributed grid computing infrastructure. We set up our own project servers right here at Harvard and custom built storage arrays with a total capacity of about 350TB. From these, 250TB are already occupied with our CEP2 raw data archive. Together with our friends at FAS Research Computing we established a tape robot backup system for our precious results. We carefully designed electronic structure calculations for the grid and have implemented an automated, high-throughput software framework, which allows us to run these on an unprecedented scale.

We then created our project database called CEPDB. It uses a MySQL backend and - as far as we know - for the first time in a large-scale scientific project a Django management system. It is scheduled for public release by the end of the year. CEPDB not only contains the raw data but various means of analyzing and mining it with respect to performance parameters in organic photovoltaics. Many of the underlying tools were either developed from scratch or we teamed up with professional software companies - in particular from the drug discovery community - to interface CEPDB with some of the most sophisticated and cutting-edge programs available. It really now is the central information, analysis, and bookkeeping hub of the project.

In addition to our computational results we have compiled a huge collection of experimental data from the scientific literature, which will also be available to the community through CEPDB. In our own research it is used for an innovative data calibration scheme as well as for the parameterization of different models for the prediction of key properties of high-performance plastic solar cell materials. We have been pioneering several new modeling approaches in the context of computational materials science using strategies from cheminformatics, pattern recognition, and machine learning.

Based on the CEP data and our modeling tools we have generated candidate lists for our various experimental collaborators, e.g., for top open-circuit voltage and short circuit current density according to our early descriptor models, and low-bandgap semiconductor candidates according to our quantum chemistry screening. We have also been a go-to group for more detailed studies of candidate compounds which has for example lead to the synthesis and characterization of a compound we predicted, which shows the second highest hole mobility that has ever been reported. At the same time we have been providing partners in the theory community with data, e.g., for benchmarking or the creation of new methods.

We have also been very busy in assorted outreach efforts to promote our project but also more generally the larger scientific enterprise. The positive feedback from you has been overwhelming. The work of CEP2 was highlighted on numerous conferences and seminars, and in particular as one of the flagship projects of the White House Materials Genome Initiative.

So, as you see, we've been very busy - even if it's not always that apparent from the outside. Many pioneering developments for computational materials science have been happening in CEP2, and it all would not have been possible without you! Thank you so much for your enthusiasm and support, and we hope that you will stay with us for another while. You guys and gals are awesome - keep crunching!

Best wishes from

Your Harvard Clean Energy Project team
[Nov 2, 2012 2:22:31 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Falconet
Master Cruncher
Portugal
Joined: Mar 9, 2009
Post Count: 3315
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Thank you so much for this update!
----------------------------------------


- AMD Ryzen 5 1600AF 6C/12T 3.2 GHz - 85W
- AMD Ryzen 5 2500U 4C/8T 2.0 GHz - 28W
- AMD Ryzen 7 7730U 8C/16T 3.0 GHz
----------------------------------------
[Edit 1 times, last edit by Falconet at Nov 2, 2012 2:32:34 PM]
[Nov 2, 2012 2:32:19 PM]   Link   Report threatening or abusive post: please login first  Go to top 
gb009761
Master Cruncher
Scotland
Joined: Apr 6, 2005
Post Count: 3010
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

So, as you see, we've been very busy - even if it's not always that apparent from the outside
your extremely frequent and informative posts, have certainly kept us all very well informed as to how things are going "in the background" - and for that, we're extremely thankful. I just wish a lot of the other projects running on WCG were even just half as interactive as you.

So, thank you very much for your updates - it's news like this that keeps us motivated and crunching biggrin
----------------------------------------

[Nov 2, 2012 4:11:25 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Dataman
Ace Cruncher
Joined: Nov 16, 2004
Post Count: 4865
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Thanks much. Keep up the good work.
----------------------------------------


[Nov 2, 2012 4:30:16 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Sgt.Joe
Ace Cruncher
USA
Joined: Jul 4, 2006
Post Count: 7849
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

I always appreciate your updates and information. Keep it up.
Cheers
----------------------------------------
Sgt. Joe
*Minnesota Crunchers*
[Nov 2, 2012 5:07:19 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Well, we are glad that you guys and gals like to hear from us. We should also mention that our Community Advisors do an awesome job here on the forum and are extremely helpful with their comments! A big "Thank you" and a lot of credit for the success of CEP goes to them!!!
Best wishes
Your Harvard CEP team
[Nov 2, 2012 5:14:01 PM]   Link   Report threatening or abusive post: please login first  Go to top 
astroWX
Advanced Cruncher
USA
Joined: Sep 1, 2007
Post Count: 56
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Excellent status-summary of your work! Appreciated.

I wish all boinc projects were as forthcoming ...
[Nov 6, 2012 7:13:23 AM]   Link   Report threatening or abusive post: please login first  Go to top 
idimitro
Cruncher
Joined: Nov 21, 2010
Post Count: 3
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

This is one of my favourite projects for crunching. Thanks for the update.
Do you have plans developing GPU client? This can make your storage look small in quite short time :)
[Nov 8, 2012 2:22:46 AM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Do you have plans developing GPU client? This can make your storage look small in quite short time :)

NOT every kind of project is suitable/efficient to do GPU computing, you know...
[Nov 8, 2012 5:04:48 AM]   Link   Report threatening or abusive post: please login first  Go to top 
Former Member
Cruncher
Joined: May 22, 2018
Post Count: 0
Status: Offline
Reply to this Post  Reply with Quote 
Re: The Clean Energy Project - Phase 2 project update, November 2, 2012

Do you have plans developing GPU client? This can make your storage look small in quite short time :)

NOT every kind of project is suitable/efficient to do GPU computing, you know...
Not to mention it's all in how you look at it...I can run 6..10..12 cores of CEP2 while still having NASA's Hubble portfolio flashing by. (Although I'd rather do the galactic tour in person, of course - but...no sign of Ford Prefect.)
[Nov 8, 2012 9:43:18 PM]   Link   Report threatening or abusive post: please login first  Go to top 
Posts: 20   Pages: 2   [ 1 2 | Next Page ]
[ Jump to Last Post ]
Post new Thread