Index  | Recent Threads  | Unanswered Threads  | Who's Active  | Guidelines  | Search
 

Quick Go »
No member browsing this thread
Thread Status: Active
Total posts in this thread: 1
[ Jump to Last Post ]
Post new Thread
Author
Previous Thread This topic has been viewed 3211 times and has 0 replies Next Thread
uplinger
Former World Community Grid Tech
Joined: May 23, 2005
Post Count: 3952
Status: Offline
Project Badges:
Reply to this Post  Reply with Quote 
DDDT2 Type C work units BETA

We are going to be releasing some new type C work units for DDDT phase 2.

These will be running the same length as the original production work units for these tests. There are about 3000 work units going to be sent out with 3 copies sent and quorum of 2 needed. They will have a turn around time of 1.5 days due to the short amount of CPU needed.

Along with these 3 batches of type C, we will have 1 batch of type B work units, but these will have the same settings as the type B work units run last week.

Thanks,
-Uplinger
[May 12, 2010 9:57:41 PM]   Link   Report threatening or abusive post: please login first  Go to top 
[ Jump to Last Post ]
Post new Thread