| Index | Recent Threads | Unanswered Threads | Who's Active | Guidelines | Search |
| World Community Grid Forums
|
| No member browsing this thread |
|
Thread Status: Active Total posts in this thread: 4
|
|
| Author |
|
|
Shinobi Gaiden
Advanced Cruncher Joined: Sep 27, 2005 Post Count: 92 Status: Offline Project Badges:
|
It might be nice to move completed projects beneath active projects for the user statistics view, so you can see the ones which can improve listed first, followed by the ones that are going to remain the same. I keep all my incoming units random, but i still look at that page wondering which projects are done and which badges can still improve. Just a thought.
|
||
|
|
gb009761
Master Cruncher Scotland Joined: Apr 6, 2005 Post Count: 3010 Status: Offline Project Badges:
|
Actually, that's how they're arranged already;
----------------------------------------- the 6 Active Projects; ... Help Cure Muscular Dystrophy - Phase 2 ... Help Fight Childhood Cancer ... Nutritious Rice for the World ... Help Conquer Cancer ... Human Proteome Folding - Phase 2 ... FightAIDS@Home - followed by the 4 Intermittent Projects; ... Influenza Antiviral Drug Search ... The Clean Energy Project ... Discovering Dengue Drugs - Together ... Beta Testing - followed by the 5 Completed Projects; ... AfricanClimate@Home ... Help Cure Muscular Dystrophy ... Genome Comparison ... Help Defeat Cancer ... Human Proteome Folding All the projects within each "sub-section", are organised in the order in which they started - thus, as HCMD2 was the last project started, it's right at the top of the "active" list, and likewise, as FA@H was the earliest project still active, it's the last in that section. What WOULD be nice, is for a line/separator to be placed in between each group, so as to emphasise the above. ![]() [Edit 2 times, last edit by gb009761 at Nov 11, 2009 5:34:23 AM] |
||
|
|
Former Member
Cruncher Joined: May 22, 2018 Post Count: 0 Status: Offline |
What WOULD be nice, is for a line/separator to be placed in between each group, so as to emphasise the above. I would think it would be good to have each group with its own color to make it immediately obvious what the status of the group is. I always look look at the intermittent projects to see if I have anything active, but it has been a very long time since I have received any work for those including Beta Testing which, I think, should be at the top of the intermittent group. Does anyone think Beta Testing will ever go away or complete? [Edit 1 times, last edit by Former Member at Nov 11, 2009 3:45:23 PM] |
||
|
|
retsof
Former Community Advisor USA Joined: Jul 31, 2005 Post Count: 6824 Status: Offline Project Badges:
|
There is always a beta test before a new project launch, or if any problems are found in an existing project requiring more beta tests.
----------------------------------------So no, beta never really goes away. It is just tough to get beta workunits if you want them, because there are not usually very many issued.
SUPPORT ADVISOR
Work+GPU i7 8700 12threads School i7 4770 8threads Default+GPU Ryzen 7 3700X 16threads Ryzen 7 3800X 16 threads Ryzen 9 3900X 24threads Home i7 3540M 4threads50% |
||
|
|
|